Active 2 weeks, 6 days ago johnjolly7551

@johnjolly7551

1 / 10000

Rank: Novice

You get points every time you submit a post, leave a comment, or interact with the site in other ways. When you get enough points, you'll hit the next level!

Member since November 2, 2026

Total Reads: 1
Total Posts: 0
Total Points: 1

Achievements

Here's where all your unlocked badges are displayed for everyone to see!

Forum Replies Created

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #11786
    johnjolly7551
    Participant

    Malik here, representing F&K Estimatings. One practical way to catch a shortage before ordering is to keep the measured quantity separate from the purchasing quantity.
    For example, a plain 12 ft by 18 ft slab at 4 inches thick is 72 cubic feet, or about 2.67 cubic yards, before any allowance. Thickened edges, steps and openings need their own checks. Record the drawing revision, measurement unit and any waste or order-rounding allowance beside the quantity so the same allowance is not added twice.
    For scheduling, also record when each material is needed and compare that with the supplier lead time; a correct total alone does not show whether the first delivery covers the next work stage. We explain the quantity, allowance and scope checks in our five checks for reviewing a takeoff. That is our company resource, offered as a review checklist rather than a guarantee against project delays.